How to Get ₹78,000 Free from the Govt for Solar in Surat
Most Surat homeowners don’t realise it, but the government will pay up to ₹78,000 directly into your bank account when you install a rooftop solar system. This is not a loan. Not a discount. It is a direct cash transfer under the PM Surya Ghar Muft Bijli Yojana — and most homes in Surat qualify for the full amount.
Here is exactly how it works and how to claim it.
Key Subsidy Amounts
The subsidy is structured by system capacity:
| System Capacity | Government Subsidy |
|---|---|
| 1 kW | ₹30,000 |
| 2 kW | ₹60,000 |
| 3 kW and above | ₹78,000 (maximum) |
Most Surat homes qualify for the maximum ₹78,000 subsidy. The reason: a typical Surat home with air conditioning and refrigeration needs a 3–5 kW system to cover its consumption — and anything 3 kW or above gets the full ₹78,000.
Eligibility Requirements
To claim this benefit, you must:
- Be an Indian citizen
- Own your residential property
- Have an active electricity connection (Torrent Power or DGVCL)
- Not have previously received solar subsidies from the government
Six-Step Application Process
Step 1 — Registration
Visit pmsuryaghar.gov.in, select Gujarat as your state, choose your electricity provider (Torrent Power or DGVCL), and enter your consumer number and contact information.
Step 2 — Apply
Complete the application form specifying the solar capacity you want on the portal. A registered, government-approved installer can help you fill this correctly.
Step 3 — Feasibility Check
Your DISCOM (Torrent or DGVCL) will check if your local transformer can handle the additional load. This is usually a quick process and approval is granted in most residential areas.
Step 4 — Installation
Select from government-approved vendors who ensure proper installation and efficiency optimisation. Using a non-approved installer can disqualify your subsidy claim, so this step is critical.
Step 5 — Net Metering
A distribution company official will install a net meter at your premises. This bidirectional meter measures electricity fed back to the grid from your solar panels, enabling you to earn credits on your electricity bill.
Step 6 — Subsidy Payment
After receiving the commissioning certificate, submit a cancelled cheque. Within 30 days, the ₹78,000 subsidy will be transferred directly to your bank account.
Required Documents
Gather these before you start the application:
- Latest electricity bill (shows your consumer number)
- Aadhaar Card
- Roof ownership proof — property tax receipt or Index-2
- Bank passbook or cancelled cheque for subsidy transfer
Financial Timeline
| Milestone | Timeline |
|---|---|
| Application to approval | 2–4 weeks |
| Installation | 1–3 days |
| Net meter installation | Within 30 days |
| Subsidy credited | Within 30 days of commissioning |
| Investment payback | 3–4 years |
| Free electricity | 21–22 more years |
With the subsidy bringing down the total cost, most Surat homeowners recover their investment in 3–4 years. After that, electricity is essentially free for the system’s 25-year lifespan.
Do not leave ₹78,000 on the table. Heaven Green Energy is a government-approved solar installer in Surat, and we handle the entire application process for you — from portal registration to net meter coordination.
Call us today: +91 63904 05060 Email: hevaensolarenergy@gmail.com Hours: Monday–Friday, 9 AM–5 PM